Attached excel sheet contains simple list that can be used to calculate or estimate project size as per requirements. The system is totally automated and evaluate projects based on simple inputs/drop down. The idea is to view triple-constraint of project management in a three dimensional triangle format. Changing one parameter has effect on another. E.g. changing time will change size, quality and cost of the project – hence it will result in change of size of project
You can try out difference combination to evaluate the size of
projects. The terms, small, medium and large corresponds to the calculation based on different parameters.
I still need to calibrate this sheet and it will mature with time and your input.